2010
| 2009 | 2008
| 2007 | 2006
| Export Projects
2010
January
mv
Savannah Belle
Vessel berthed and commenced discharge
19/01 and completed 21/01
Cargo - 142 pces / 1249 ton / 3053 m3
comprising:
- Mining equipment
- 34 copper pots – each 4 x 3.45 x 3 /
27 ton
- 1 excavator – 22 ton
- 107 pces equipment – largest piece
4 x 4.35 x 4.55
Clients
- Sun Line International Logistics
- Chambishi Copper Smelter Kitwe
- NFC Mining Luanshya
 Paccon’s
scope was from liner out Durban to door
destination Zambia including; arranging all relevant
port and customs authority bonded clearances for
transit through to site, supervise the receival
of cargo ex ship and loading out, surveying of
cargo for any damages or shortages, appoint and
manage the transport contractors comprising 54
loads, provide daily tracking reports to clients
and ensure all cargo delivered to site and within
the clients limited time-frame.
Due to the nature of the cargo, 48 of the 54
loads undertaken were landed direct ex ships hook
to our trailers. This requires a lot of planning
and co-operation between the various parties involved
and happily we enjoy good relationships with all
role players.
On 5/02, a mere 15 days after the ship completed
discharge, having travelled some 2500kms across
3 international borders, the last loads arrived
at site to the satisfaction of all concerned.
|